- Enough space for cabling and access to the side and back of server racks and other equipment, and you must have enough height to accommodate a raised floor as well as the extra air-conditioning and ventilation ducts requirements based on your existing needs and well as three to five years into the future..
- Should try to stay away from basement and ground floor levels, where you run the risk of flooding in the basement and roof leaks on the top floors & border outside Server room walls can make temperature and humidity control difficult, especially if they have windows.Avoid areas of the building with high traffic, for physical security reasons.
- Determine the maximum load ratings for every piece of hardware that will be in your data center.
- Estimate the number of outlets required and their approximate placement.
- Data centers with domain controllers, DNS servers, web servers and other mission critical systems will require backup generators as well as UPS units
- Data centers with domain controllers, DNS servers, web servers and other mission critical systems will require backup generators as well as UPS units